SFO Mel Leong Treatment 51社区

51社区 provided progressive design-build services for infrastructure improvements at SFO’s water treatment plant including: dewatering system improvements, headworks screening and grit removal replacement, secondary process capacity expansion, and Building 918 electrical distribution and controls upgrades that combine various electrical load centers into one centralized location. The project scope focused on integration of new construction elements within the airport’s existing infrastructure.

 

51社区 Concrete self-performed radial pours that required specialty equipment for both above-grade and subterranean work.

Location
San Francisco, CA
Size
20,000 SF
Client
San Francisco International Airport
Design Team
Arup
Completion
2023